The Shellharbour Club

Hospitality

//The Shellharbour Club
The Shellharbour Club 2018-03-05T21:40:41+00:00

Project Description

Ergo group were nominated as a principal contractor by Pure Projects and engaged by The Shellharbour Club to build a new main switch room and install a new Main Switch Board (MSB) to increase the power capacity for future expansion of the club. A challenging project as the new MSB was required to be built and commissioned within a 4-hour time frame. Given the scale of the project, the new installation went smoothly with the shutting down of the sub-station and transfer of services from the existing switchboard to the new MSB all complete within the 4-hour timeframe without any interruption to the club’s operations.

In addition, Ergo Group were engaged by Event Engineering to provide power, light controls, and communication systems to the new state of the art street style dining destination “The Precinct”.

The project was delivered in a Design & Construct model with all design work completed by Ergo Group.

Project Details

Sector:

Hospitality